Lane closures planned on Beaver St and Butler Ave for fiber installation



FLAGSTAFF, Ariz – Beginning April 1, the City of Flagstaff and its contractor, Network Cabling Systems, will be installing fiber-optic line in the Southside area of Flagstaff between Aspen Ave and Butler Ave. There will be lane closures from 8:30 a.m. to 3:30 p.m. on Beaver St and Butler Ave, as well as mobile flagging operations along Phoenix Ave and Mikes Pike St. Work is expected to be completed by May 1.

DO NOT COPY OR SCREENSHOT THIS POST TO ANY OTHER SOURCE! THIS IS COPYRIGHTED MATERIAL AND DOING SO WILL REVOKE YOUR ACCESS DUE TO TOS VIOLATION. LEGAL ACTION MAY RESULT. REPORT VIOLATIONS TO BreakingNews@Flagscanner.com.

This project will enable better traffic signal management on Butler, higher internet speeds at the Visitor’s Center, and future expansion of low-cost, high-speed internet access for the Flagstaff community.

(Visited 44 times, 1 visits today)